Date Description  Department Document Type 
 09.05.17

McDonald Square 75% Design Public Presentation

The Town's consultant (BETA Group) presented the 75% Design plans for the McDonald Square Sidewalk Improvements project at a public meeting held on 9/5/17 at the Endicott Estate. This design is the result of the Accessibility Study conducted for this area in 2016-2017.

Engineering Dept  Reports 
 08.09.17

Sidewalk Condition Index (SCI)

Map showing the current conditions of the 87 miles of existing Public Way sidewalks as of 12/31/16.

Engineering

Dept

Reports 
 06.15.17

FY2018 - FY2020 Road Program

FY2018 - FY2020 approved road improvements as endorsed by the Board of Selectmen at their June 15, 2017 meeting

Engineering

Dept

Reports 
 03.06.17

McDonald Square Accessibility Study

The Town's consultant (BETA Group) was hired to assess the existing pedestrian accessibility and ADA compliance within the McDonald Square study area. The report also includes recommendations based on the field assessment.

Engineering

Dept

Reports 
 02.06.17

 2016 Engineering Department Annual Update

This memorandum is a yearly update on some of the projects that the Engineering Department is currently working on and/or involved with.

Engineering Dept Reports
04.08.16 

Colburn Street Dam - Phase II Investigation Report

The Town's consultant (Dewberry) was hired to conduct a Phase II Investigation Report on the Colburn Street Dam

Engineering Dept Reports
03.31.16 FY2017 - FY2019 Road Program
FY2017 - FY2019 approved road improvements, as endorsed by the Board of Selectmen March 28, 2016.
Engineering Dept Reports
10.08.15  Stormwater BMP Retrofit Development Dedham, MA
The Engineering Dept. partnered with the Neponset River Watershed Association and Nitsch Engineering to identify sites suitable for retrofitting with structural stormwater Best Management Practices (BMPs).
Engineering Dept Reports
08.27.15  2014 Private Building Inspection
This is the Final report as prepared by Weston & Sampson for the 2014 Private Building Inspections.
Engineering Dept Reports
07.23.15 Public Meeting Notice - Colburn Street Bio-Retention Basin Project
Public Meeting being held for anyone interested in becoming fully acquainted with the Project.
Engineering Dept Reports
04.13.15 2014 Smoke Testing Program - March 2015
Final report for the 2014 Inflow Investigation which included smoke and dye testing performed by Weston & Sampson. (Due to the large file size, please contact the Engineering Department for a copy of this document)
Engineering Dept Reports
02.13.15  FY2016 - FY2018 Road Program
FY2016 - FY2018 approved road improvements, as voted by the Board of Selectmen February 12, 2015.
Engineering Dept Reports
02.13.15 2014 Engineering Department Update
This memorandum is a yearly update on some of the projects that the Engineering Department is currently working on and/or involved with.
Engineering Dept Reports
11.17.14  Violet Avenue - Riverdale Area Drainage Evaluation Hydraulic Flow Model Report
Hydraulic study performed by Weston & Sampson.
Engineering Dept Reports 
11.14.14  Final Report - Sewer System Hydraulic Flow Model - September 2014
Performed by Weston & Sampson in 2014 to evaluate the Town's sewer system.
Engineering Dept Reports
09.11.14 Colburn Street Dam - Follow-Up Inspection 9/15/2013
Follow-up inspection performed on the Colburn Street Dam in 2013.
Engineering Dept Reports
09.11.14 Colburn Street Dam - Phase 1 Assessment Phase 1
Assessment report on the Colburn Street Dam performed on May 23, 2006.
Engineering Dept Reports
09.04.14 2013 Year One Inflow Investigations - March 2014
Final report for the 2012 Inflow Investigation which included smoke and dye testing performed by Weston & Sampson.
Engineering Dept Reports
04.29.14 2014-2015 Private Building Inspection Program
Presentation made to the BOS at their meeting held on March 20, 2014.
Engineering Dept Brochures
01.31.14 Revised - Town of Dedham Sewer Regulations
On 9/19/2013 the Town revised Sections 5.0 and 8.0 of the 2006 Sewer Regulations. These sections refer to State permits and sewer easements.
Engineering Dept Applications
03.18.13 2012 Inflow Investigation Report - Feb 2013
Final report for the 2012 Inflow Investigation which included smoke and dye testing performed by Weston & Sampson.
Engineering Dept Reports
03.18.13 Inflow & Infiltration Investigation and Rehabilitation Report - Feb 2013
Report generated in Feb 2013 by Weston & Samspson to aid the Town of Dedham in its annual I/I program.
Engineering Dept Reports
01.04.13 FY2013 Pavement Management Summary Report
This memorandum was presented to the BOS at their January 3, 2013 meeting. The report summarizes the road improvements which were undertaken over the past construction season.
Engineering Dept Reports
10.26.12 Final Report - Municipal Building Inspections
Final report summarizing the results of the Municipal Building Inspections performed by Weston & Sampson.
Engineering Dept Reports
01.27.12 Traffic Calming Policy Traffic Calming Policy - Adopted 1/26/2012 Engineering Dept Reports

Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Acrobat Reader Flash Player QuickTime Windows Media Player Microsoft Silverlight Word Viewer Excel Viewer PowerPoint Viewer