News

Print
Share & Bookmark, Press Enter to show all options, press Tab go to next option

Needham Street Pilot Project Updates

Delineators along Needham Street in front of the Riverdale School installed Friday, May 31
Post Date:05/31/2024 3:05 pm

Installation of the delineators along Needham Street was completed today, May 31, 2024 (two photos below). These delineators have been installed along this section of Needham Street (in front of the Riverdale School) as part of the Needham Street Lane Narrowing Pilot Project put forth by the Active Transportation Working Group (ATWG) and approved by the Select Board.

The Pilot Project will be conducted over a 6-month period and the results and findings will be presented to the community at public information session in October or November of this year (final date to be announced.)

Click on the images below to enlarge

Needham Street delineators along shoulders

Caption (above): Newly installed delineators along the outer edge of Needham Street (Photo facing west toward Riverdale School)

Cars driving by white delineators installed along shoulder

Caption (above): Delineators installed in front of the Riverdale School with cars driving by (Photo taken facing west, in front of school driveway)

Next Steps

The Pilot Project and associated study will be conducted over a 6-month period and the results and findings will be presented to the community at public information session in October or November of this year (final date to be announced.)

Maintenance During the Pilot

The Dedham DPW team will maintain the delineators throughout the timeline of the study, and each will be installed so as to not impede or negatively impact access to services, including curbside trash/recycling collections. If a resident does experience an interruption in their curbside collection services, please contact the DPW via the online service request portal or by calling the DPW at 781-751-9350.

About the Project

This lane narrowing will be accomplished by physically narrowing the existing travel lane widths of 13 feet to 10 feet with plastic delineators. The delineators will be installed from the roundabout at Vine Rock to Hillside. The Town Engineering department will conduct a study prior to installation and during the pilot to measure vehicle behaviors.

To learn more about this project or to contact the ATWG directly, please visit www.dedham-ma.gov/ATWG.

More Info

Contact Information

If you have comments, questions or concerns related to this project, or accessibility & safety around the Needham St corridor, please email atwgdedham@gmail.com or visit www.dedham-ma.gov/ATWG

Return to full list >>