Project Update - October 24, 2025

Please use the following links to access the report and presentation slides as shared with the Select Board at its October 23 public meeting:

No results found.

About the Project

Working with consultants from Weston & Sampson, the Town has developed a Door-to-Door Inspection Program of all properties within the following designated project area in response to a number of reported instances where property owners have experienced a backup of sewage into their homes, on their properties, and along nearby roadways.

Video Demonstration of Inspection

The team from Weston & Sampson recorded an inspection conducted at a residential property within the study area in Dedham to show what a typical inspection will include and how long it is expected to take.

Note: This video was recorded with permission from the property owner.

Project Area Overview

Key Dates
Project Timeline